Strong ancillary industrial/commercial opportunity. Direct site power, water, fiber and zoning need verification.
Immediate proximity to one of the country’s largest AI infrastructure developments.
Excellent support-industry and longer-term data infrastructure candidate; site-specific power must be established.
Multiple ingress/egress points; utility availability; large contiguous acreage; proximity to Meta’s multi-gigawatt AI campus.
Potential support, expansion, contractor or ancillary-use property. Confirm easements, pipeline constraints and development entitlements.
Utilities onsite; immediate data-center adjacency; fenced tract.
Small for hyperscale use but strong for vendors, contractors, edge infrastructure or support operations.
Fiber onsite; electric onsite; water well; close to Hyperion.
Smaller site, but strong for ancillary infrastructure or specialized high-load use subject to utility confirmation.
Major power line along frontage road; substation nearby; more than 1,200 feet of I-77 frontage.
Requires validation of power capacity, fiber and commercial entitlement before data-center marketing.
Water and power access reported; low acquisition basis; significant regional development activity.
Speculative development land. Zoning change, utility capacity and infrastructure must be verified.
Low basis per acre; proximity to data center growth; major proposed roadway infrastructure.
Speculative: power, water, fiber, zoning conversion and environmental constraints require full diligence.
Large low-cost acreage near emerging industrial growth.
Not currently demonstrated as data-center-ready; full utility and entitlement diligence needed.
Affordable acreage in an emerging infrastructure corridor.
More speculative than power-ready sites. Requires full zoning, power, water and fiber diligence.
Large assemblage in a data-center-intensive state.









