Power configuration makes this a priority Nuclear Landman listing. Exact available deliverable MW and utility study status should be confirmed.
Two substations onsite; transformer capacity disclosed in listing; six available breakers; approximately two miles from I-95.
Suitable for a single-user campus or phased industrial/data center development, subject to utility-capacity confirmation.
Industrial zoning; water; sewer; power; dual-road access; signalized intersection; regional I-20 access.
Excellent ancillary/support-services location. Large hyperscale suitability depends on power and parcel configuration.
Utilities available; I-24 access; immediate proximity to major industrial employers and Google data center.
Located in a fast-growing AI/data center market. Utility deliverability and zoning entitlement should be confirmed.
Water and electric onsite; heavy industrial power nearby; multiple structures; gravel resource onsite.
Strong ancillary industrial/commercial opportunity. Direct site power, water, fiber and zoning need verification.
Immediate proximity to one of the country’s largest AI infrastructure developments.
Potential support, expansion, contractor or ancillary-use property. Confirm easements, pipeline constraints and development entitlements.
Utilities onsite; immediate data-center adjacency; fenced tract.
Small for hyperscale use but strong for vendors, contractors, edge infrastructure or support operations.
Fiber onsite; electric onsite; water well; close to Hyperion.









